Large stock, please search or inquiry

Fenoux Electric Co., Ltd.
Home / Products / Honeywell / 51308386-175 Honeywell Controller module Brand new

51308386-175 Honeywell Controller module Brand new

The maximum allowable field wiring resistance between the transmitter and the IOTA connection terminal is dependent upon the voltage requirement of the transmitter. The formula for calculating the maximum wiring resistance for the Series C UIO channel used as an analog input is given by the following equation.

INQUIRE NOW

Products Name: 51308386-175 Honeywell Controller module Brand new

PRODUCT DESCRIPTION

Brand:   Honeywell  

Model number:51308386-175  

Colour:new                  

Warranty: 12 months

Lead Time:3-day working day   

Country of origin: USA Price: Please contact us         

Product weight:0.5kg

Shipping Port:  China

Payment: Bank of Chicago, Bank of Singapore

Express cooperation: fedex, DHL, UPS and your express account

Service Professional Sales provides 24 hours /7 days online service

51308386-175   Honeywell   Controller module Brand new

Description:

l Touch a grounded object to discharge static potential,

l Wear an approved wrist-strap grounding device,

l Do not touch the connector pins,

l If available, use a static safe workstation

13.2.2 Work practices

Before installation, follow these work practices when performing general tasks:

l Ensure that all installation work is to be carried out in accordance with local standards, codes of

practice and site regulations and any other special requirements stated in this manual.

l Check that all module functions are correct for the application

l Take care to avoid damaging the pins at all connector interfaces

l Ensure that AC mains supplies have been isolated.

l It is recommended that some form of mechanical assistance is used for lifting and supporting

the enclosure when installing it.

13.2.3 Hazardous areas

This subsection describes the considerations that should be given to Zone 2 and Division 2

hazardous environments of the equipment prior to its installation.

Work activities in a Zone 2 and Division 2 hazardous area are restricted in order to avoid ignition of

explosive gas/air mixtures.

13.2.4 Operations

The equipment must only be installed, operated and maintained by trained competent personnel.

13.2.5 Checking and Maintenance

The installation and maintenance must be carried out in accordance with all appropriate

international, national and local standard codes of practice and site regulations in accordance with

the instructions contained in this manual.

13.2.6 Installation

The installation must comply with the appropriate European, national and local regulations, which

may include reference to the IEC code of practice IEC 60079-14. In addition, particular industries

or end users may have specific requirements relating to the safety of their installations and these

requirements must be met. For the majority of installations the Directive 1999/92/EC [the ATEX

Directive - safety of installations] is also applicable.


image.png

Shipping Port: China

Payment: Bank of Chicago, Bank of Singapore

Express cooperation: fedex, DHL, UPS and your express account

Service: Professional Sales provides 24 hours /7 days online service

Related products:

TC-IXL062

TC-KIOL02

TCM4351A

TCM4351B

TC-OAH061

TC-ODD32

TC-ODX161

TCP202A

TC-RPFM01

TCSECE300R2

TCSEK3MR10

TC-TG-F1C3

TC-XXXXX2