Large stock, please search or inquiry

Fenoux Electric Co., Ltd.
Home / Products / Honeywell / 621-9934C Honeywell Controller module Brand new

621-9934C Honeywell Controller module Brand new

Each controller is programmable because the user chooses which function blocks to use and how to connect 

them. It is configurable because each Function Block has 

user-defined behavior.


INQUIRE NOW

Products Name: 621-9934C Honeywell Controller module Brand new

PRODUCT DESCRIPTION

Brand:   Honeywell  

Model number:621-9934C 

Colour:new                  

Warranty: 12 months

Lead Time:3-day working day   

Country of origin: USA Price: Please contact us         

Product weight:0.5kg

Shipping Port:  China

Payment: Bank of Chicago, Bank of Singapore

Express cooperation: fedex, DHL, UPS and your express account

Service Professional Sales provides 24 hours /7 days online service

621-9934C   Honeywell  Controller module Brand new

Description:

To replace the FOE fuse on the terminal block when the FOE is mounted

on the DIN rail

1. Using the lever provided on the terminal block, open the fuse holder.

2. Remove the fuse from the fuse holder.

3. Replace the fuse by positioning it in the fuse holder, press and fit.

4. Close the fuse holder and press the lever to lock.

13.5.13 Removing the FOE module from the DIN rail

To remove the FOE module from the DIN rail

1. Power down the FOE module by opening the fuse holder of the terminal block using the lever

and removing the fuse

2. Remove all the cables before detaching the FOE modules. Perform the following steps to do so.

a. Unscrew and remove the cable (HPN 51202930-200) running from the feed through

terminal of the system cabinet to the '+' fuse terminal of the terminal block

(Meanwell/Phoenix Contact power supply only).

b. Remove the power connector of the cable (HPN 51202948-100/51202948-200) from the

power supply by releasing the lock in the side and pulling it out gently (TDI power supply

only).

c. Unfasten the screw of the '-' fuse terminal of the terminal block on DIN rail and remove

the cable.

d. Unfasten the screw of the 'V+' terminal of power connector on the FOE module and

remove the cable.

e. Unfasten the screw of the '-' terminal of the feed through terminal block and remove the

cable.

f. Unfasten the screw of the 'V-' terminal of power connector on the FOE module and

remove the cable.

g. Remove the fiber optic cables from the FOE module by pulling it out gently.

h. Unscrew and remove the I/O Link cable (HPN 51202789-910 / 51202789-911) from the

FOE module or remove the I/O Link connector by pulling it out.

3. Unfasten the screw in the center of the end bracket and remove it by slightly lifting and pulling

it out.

4. Push the FOE module slightly downwards and slide it out at the lower edge of DIN rail.

WARNING

Powering off both FOE modules accidently may halt the IOL communication

completely and can lead to dangerous situation in plant. You must ensure to turn off

the power of suspected FOE and should remove it without disturbing the functional

FOE. Ensure to notify plant operators while performing this operation.


image.png

Shipping Port: China

Payment: Bank of Chicago, Bank of Singapore

Express cooperation: fedex, DHL, UPS and your express account

Service: Professional Sales provides 24 hours /7 days online service

Related products:

TC-IXL062

TC-KIOL02

TCM4351A

TCM4351B

TC-OAH061

TC-ODD32

TC-ODX161

TCP202A

TC-RPFM01

TCSECE300R2

TCSEK3MR10

TC-TG-F1C3

TC-XXXXX2