In no event is Honeywell liable to anyone for any direct, special, or consequential damages. The information and specifications in this document are subject to change without notice.
INQUIRE NOW
Products Name: MC-TAIH14 Honeywell Central control module Brand new
PRODUCT DESCRIPTION
Brand: Honeywell
Model number:MC-TAIH14
Colour:new
Warranty: 12 months
Lead Time:3-day working day
Country of origin: USA Price: Please contact us
Product weight:0.5kg
Shipping Port: China
Payment: Bank of Chicago, Bank of Singapore
Express cooperation: fedex, DHL, UPS and your express account
Service : Professional Sales provides 24 hours /7 days online service
MC-TAIH14 Honeywell Central control module Brand new
Description:
Click OK.
The IOM block load starts. The Load dialog box displays the progress and the respective
information.
TIP
You can also check load progress through the four-LED display on the front panel
of the IOM. The display changes from NODB to NOEE to OK upon a successful
Load.
If errors are detected, then the errors are displayed in the Load progress dialog box
and you can continue the load or cancel, depending on the nature of the error. It is
recommended that you cancel the load and identify and fix the errors. Each
message includes an error code in parentheses. Note the last number in the string.
For more information about the error code, see Control Builder Error Code Reference.
4. Once the load completes and the dialog box closes, click the Monitoring view.
IOP/IOM icons now appear in Monitoring view. The default state for a loaded IOP/IOM is active
or color code green.
ATTENTION
When you load the imported IOMs, ensure that all the channel type (PNTTYPE) is
identical with the loaded channels. If the channel type is not identical, then the
corresponding channels must be deleted from the Monitoring view before loading
the imported IOM.
l Loading with the IOM block missing on the IOLINK
l Reloading the IOM block from Project or Monitoring
l Reviewing IOM re-configuration rules
11.2.3 Loading with the IOM block missing on the IOLINK
IOM blocks can be loaded without the IOM present on the link, but the following occurs:
l Errors are returned on load and the IOM icon appears red in the Monitoring Tab.
Refer to Reviewing the Series C I/O block icons in Control Builder to view icon appearance
based on current status.
l Since the IOM is responsible for error checking the loaded data, you must either reload the
IOM or perform a checkpoint restore when the IOM later appears on the I/O Link.
11.2.4 Reloading the IOM block from Project or Monitoring
The behavior of the IOM when the IOM is reloaded from the Project view or the Monitoring view is
explained as follows:
.
Shipping Port: China
Payment: Bank of Chicago, Bank of Singapore
Express cooperation: fedex, DHL, UPS and your express account
Service: Professional Sales provides 24 hours /7 days online service
Related products:
TC-IXL062
TC-KIOL02
TCM4351A
TCM4351B
TC-OAH061
TC-ODD32
TC-ODX161
TCP202A
TC-RPFM01
TCSECE300R2
TCSEK3MR10
TC-TG-F1C3
TC-XXXXX2
The winter solstice is Du 1 of the four solar terms of 20 Bai, and ...
Dec. 18 , 2020Let's first take a look at the literal meaning of the DCS system.
Dec. 24 , 2020