Large stock, please search or inquiry

Fenoux Electric Co., Ltd.
Home / Products / Honeywell / MC-TAIH14 Honeywell Central control module Brand new

MC-TAIH14 Honeywell Central control module Brand new

In no event is Honeywell liable to anyone for any direct, special, or consequential damages. The information and specifications in this document are subject to change without notice.

INQUIRE NOW

Products Name: MC-TAIH14 Honeywell Central control module Brand new

PRODUCT DESCRIPTION

Brand:   Honeywell  

Model number:MC-TAIH14

Colour:new                  

Warranty: 12 months

Lead Time:3-day working day   

Country of origin: USA Price: Please contact us         

Product weight:0.5kg

Shipping Port:  China

Payment: Bank of Chicago, Bank of Singapore

Express cooperation: fedex, DHL, UPS and your express account

Service Professional Sales provides 24 hours /7 days online service

MC-TAIH14  Honeywell   Central control module Brand new     

Description:

 Click OK.

The IOM block load starts. The Load dialog box displays the progress and the respective

information.

TIP

You can also check load progress through the four-LED display on the front panel

of the IOM. The display changes from NODB to NOEE to OK upon a successful

Load.

If errors are detected, then the errors are displayed in the Load progress dialog box

and you can continue the load or cancel, depending on the nature of the error. It is

recommended that you cancel the load and identify and fix the errors. Each

message includes an error code in parentheses. Note the last number in the string.

For more information about the error code, see Control Builder Error Code Reference.

4. Once the load completes and the dialog box closes, click the Monitoring view.

IOP/IOM icons now appear in Monitoring view. The default state for a loaded IOP/IOM is active

or color code green.

ATTENTION

When you load the imported IOMs, ensure that all the channel type (PNTTYPE) is

identical with the loaded channels. If the channel type is not identical, then the

corresponding channels must be deleted from the Monitoring view before loading

the imported IOM.

l Loading with the IOM block missing on the IOLINK

l Reloading the IOM block from Project or Monitoring

l Reviewing IOM re-configuration rules

11.2.3 Loading with the IOM block missing on the IOLINK

IOM blocks can be loaded without the IOM present on the link, but the following occurs:

l Errors are returned on load and the IOM icon appears red in the Monitoring Tab.

Refer to Reviewing the Series C I/O block icons in Control Builder to view icon appearance

based on current status.

l Since the IOM is responsible for error checking the loaded data, you must either reload the

IOM or perform a checkpoint restore when the IOM later appears on the I/O Link.

11.2.4 Reloading the IOM block from Project or Monitoring

The behavior of the IOM when the IOM is reloaded from the Project view or the Monitoring view is

explained as follows:

.


image.png

Shipping Port: China

Payment: Bank of Chicago, Bank of Singapore

Express cooperation: fedex, DHL, UPS and your express account

Service: Professional Sales provides 24 hours /7 days online service

Related products:

TC-IXL062

TC-KIOL02

TCM4351A

TCM4351B

TC-OAH061

TC-ODD32

TC-ODX161

TCP202A

TC-RPFM01

TCSECE300R2

TCSEK3MR10

TC-TG-F1C3

TC-XXXXX2