In redundant PIM modules, after a switchover, if the alarm for the reported channel still persists on the new primary, this most likely indicates a problem in the field wiring.
INQUIRE NOW
Products Name: TC-CCN013 Honeywell Central control module Brand new
PRODUCT DESCRIPTION
Brand: Honeywell
Model number:TC-CCN013
Colour:new
Warranty: 12 months
Lead Time:3-day working day
Country of origin: USA Price: Please contact us
Product weight:0.5kg
Shipping Port: China
Payment: Bank of Chicago, Bank of Singapore
Express cooperation: fedex, DHL, UPS and your express account
Service : Professional Sales provides 24 hours /7 days online service
TC-CCN013 Honeywell Central control module Brand new
Description:
ATTENTION
l (1) Operating Limits define the range of operating conditions within which the
system is designed to operate. Performance characteristics are defined when
operating in this state. Refer to ANSA/ISA D 51.1 for more information.
o Transportation and Storage Limits define the range of conditions to which
the system may be subjected without permanent damage to the
equipment. Performance is not guaranteed in this state. Refer to ANSA/ISA
D 51.1 for more information.
l (2) This rating applies to the internal ambient temperature of the enclosure with the
doors closed.
l (3) The maximum relative humidity spec applies up to 40°C. Above 40°C, the RH spec
is de-rated to 55% to maintain constant moisture content.
l (4) Measured with the field strength meter near the surface of the electronics with
doors open.
l (5) Applied to items those are likely to be in contact with discharge sources (For
example, human body) during typical maintenance actions.
l (6) 10 Hz is approximate – exact crossover frequency is determined by the
intersection of the displacement and acceleration.
l (7) Composite Transportation Test Curve--encompassing maximum Random
Vibration power spectral density values associated with ground, air, and sea
transportation environments.
The rail-mounted UIO is not designed to meet the Marine Application requirement.
8.9 Rail-mounted UIO module assembly
8.9.1 Installation declarations
ATTENTION
This equipment shall be installed in accordance with the requirements of the National
Electrical Code (NEC), ANSI/NFPA 70, or the Canadian Electrical Code (CEC), C22.1. It is
supplied as "open equipment" that is intended to be mounted on a sub-panel within an
enclosure. The suitability of the enclosure and installed system shall be acceptable to the
local "authority having jurisdiction," as defined in the NEC, or "authorized person" as defined
in the CEC.
Shipping Port: China
Payment: Bank of Chicago, Bank of Singapore
Express cooperation: fedex, DHL, UPS and your express account
Service: Professional Sales provides 24 hours /7 days online service
Related products:
TC-IXL062
TC-KIOL02
TCM4351A
TCM4351B
TC-OAH061
TC-ODD32
TC-ODX161
TCP202A
TC-RPFM01
TCSECE300R2
TCSEK3MR10
TC-TG-F1C3
TC-XXXXX2
The winter solstice is Du 1 of the four solar terms of 20 Bai, and ...
Dec. 18 , 2020Let's first take a look at the literal meaning of the DCS system.
Dec. 24 , 2020