Large stock, please search or inquiry

Fenoux Electric Co., Ltd.
Home / Products / B&R / 8V1090.00-2 B&R central processing unit

8V1090.00-2 B&R central processing unit

INQUIRE NOW

Products Name: 8V1090.00-2 B&R central processing unit

PRODUCT DESCRIPTION

Brand:B&R 

Model number:8V1090.00-2

Colour:new                  

Warranty: 12 months

Lead Time:3-day working day   

Country of origin: USA Price: Please contact us         

Product weight:0.25kg

Shipping Port: Xiamen, China

Payment: Bank of Chicago, Bank of Singapore

Express cooperation: fedex, DHL, UPS and your express account

Service: Professional Sales provides 24 hours /7 days online service

Description:

Status Description 

Off No power supply or mode is NOT_ACTIVE. In this mode, the bus controller waits for about 5 seconds after restarting. No communication with the bus controller is possible. If no POWERLINK communication is detected during these 5 seconds, the bus controller goes into the BASIC_ETHERNET mode. If POWERLINK communication is detected before this time passes, however, the bus controller goes into the PRE_OPERATIONAL_1 mode. Flickering BASIC_ETHERNET mode. The bus controller did not detect any POWERLINK communication. In this mode, direct communication with the bus controller is possible using UDP. If POWERLINK communication is detected while in this mode, the bus controller goes into the PRE_OPERATIONAL_1 mode. Single flash PRE_OPERATIONAL_1 mode. With operation on a POWERLINK V1 master, the bus controller goes directly into PRE_OPERATIONAL_2 mode. With operation on an POWERLINK V2 manager, the CN (Controlled Node) waits for the reception of a SoC frame and then switches over to PRE_OPERATIONAL_2 mode. Double flash PRE_OPERATIONAL_2 mode. In this mode the bus controller is normally configured by the manager. A command (POWERLINK V2) or setting the data valid flag in the output data (POWERLINK V1) then switches the mode to READY_TO_OPERATE. Triple flash READY_TO_OPERATE mode. In a POWERLINK V2 network, the manager then switches via command to OPERATIONAL mode. In a POWERLINK V1 network, the bus controller then switches automatically to OPERATIONAL mode as soon as input data are present. On OPERATIONAL mode Green Blinking STOPPED mode. No output data sent nor input data received. Only the appropriate command from the manager can enter or leave this mode. S/E1) 

Red On The bus controller has encountered an error (failed Ethernet frames, increased number of collisions on the network, etc.). 

Note: The LED blinks red several times immediately after startup. This is not an error. L/A IFx Green On Link established to the remote station Blinking A link to the remote station has been established and there 

X20BB80   B

Shipping Port: Xiamen, China

Payment: Bank of Chicago, Bank of Singapore

Express cooperation: fedex, DHL, UPS and your express account 

Service: Professional Sales provides 24 hours /7 days online service

Relevant details:

X20IF1061-1

X20IF10E1-1

X20IF10E3-1

X20IF2772

X20PD2113

X20PS2100

X20PS9400

X20PS9600

X20SC2212

X20SI9100

X20SL8100

X20SM1426

X20SO4110

X20SO4120

X20SO4120

X20TB12

X20TB1F

X67AI1223

X67BC8321-1

X67BC8321.L12