Brand:B&R
Model number:X20IF1072
Colour:new
Warranty: 12 months
Lead Time:3-day working day
Country of origin: USA Price: Please contact us
Product weight:0.40kg
Shipping Port: China
Payment: Bank of Chicago, Bank of Singapore
Express cooperation: fedex, DHL, UPS and your express account
B&R X20IF1072 Output Point I/O Module
INQUIRE NOW
Products Name: B&R X20IF1072
PRODUCT DESCRIPTION
Based on state-of-the-art Intel® ATOM™ processor technology, the X20 CPUs cover a wide spectrum of demands.
They can be implemented in solutions ranging from standard applications to those requiring the highest levels of
performance.
The series starts with Intel® ATOM™ processor 333 MHz compatible models – X20CP1583 and X20CP3583. With
an optimum price/performance ratio, it has the same basic features as all of the larger CPUs.
The basic model includes USB, Ethernet, POWERLINK V1/V2 and removable CompactFlash. The standard Ethernet interface is capable of handling communication in the gigabit range. For improved real-time network performance, the onboard POWERLINK interface supports poll response chaining mode (PRC).
In addition, there are up to three multi-purpose slots for additional interface modules.
Description:
1) The specified values are maximum values. The exact calculation is included as a data sheet in the module documentation and can be downloaded from
the B&R website.
2) When operated at temperatures above 55°C, a derating of the rated output current to 5 W for the X2X Link supply must be taken into consideration.
3) In parallel operation, only 75% of the rated power can be assumed. It is important to make sure that all power supplies operating in parallel are switched
on and off at the same time.
4) Can be configured in Automation Studio.
5) 1 MB SRAM minus the configured remanent variables.
6) See the POWERLINK online help documentation under "General information, Hardware - IF/LS".
LED Color Status Description
Green On Application running
On SERVICE mode
R/E
Red
Double flash BOOT mode (during firmware update)1)
Yellow On SERVICE or BOOT mode RDY/F
Red On Overtemperature
S/E Green/Red Status/Error LED. The LED indicators are described in section 6.1 ""S/E" LED".
On A link to the POWERLINK remote station has been established. PLK Green
Blinking A link to the POWERLINK remote station has been established. Indicates Ethernet activity is taking place on the bus.
On A link to the peer station has been established. ETH Green
Blinking A link to the peer station has been established. Indicates Ethernet activity is
taking place on the bus.
Green On CompactFlash inserted and detected CF
Yellow On CompactFlash read/write access
Yellow On CPU power supply OK DC
Red On Backup battery empty
Payment: Bank of Chicago, Bank of Singapore
Express cooperation: fedex, DHL, UPS and your express account
Service: Professional Sales provides 24 hours /7 days online service
Related products:
B&R | X20AT4222 | B&R | 5D5210.01 | B&R | ECE243-0 | |
B&R | X20AT4222 | B&R | 5D5211.03 | B&R | ECNT43-0 | |
B&R | X20AT4222 | B&R | 5D5213.01 | B&R | ECPA81-2 | |
B&R | X20BB80 | B&R | 5PC511.SX01-00 | B&R | ECPE82-2 | |
B&R | X20BB80 | B&R | 5PC600.SX01-00 | B&R | ECPE84-0 | |
B&R | X20BB81 | B&R | 5PC720.1043-00 | B&R | ECPE84-2 | |
B&R | X20BB82 | B&R | 5PC720.1043-01 | B&R | ECPNC3-0 | |
B&R | X20BB82 | B&R | 5PC7201043-01 | B&R | ECPP40-01 | |
B&R | X20BB82 | B&R | 5PC750.1043-K01 | B&R | ECPP60-01 | |
B&R | X20BB82 | B&R | 5PC810.SX01-00 | B&R | HCMARC-0CT | |
B&R | X20BC0043 | B&R | 5PC810.SX02-00 | B&R | MCGE31-0 | |
B&R | X20BC0063 | B&R | 5PC820.1906-00 | B&R | MDA115-0 | |
B&R | X20BC0083 | B&R | 5PC910.SX02-00 | B&R | 2CP100.60-1 | |
B&R | X20BC1083 | B&R | 7CP474.60-1 | B&R | 2BM100.9 | |
B&R | X20BC1083 | B&R | 7CP476.60-1 | B&R | 5PC810.SX05-00 | |
B&R | X20BC8083 | B&R | 7CP476-020.9 | B&R | 5C2001.01 | |
B&R | X20BC8083 | B&R | 7XX408.50-1 | B&R | 5C5601.32 | |
B&R | X20BC8083 | B&R | 8B0C0320HW00.002-1 | B&R | 5C5001.32 | |
B&R | X20BM01 | B&R | 8BVI0055HWD0.000-1 | B&R | 5C5001.03 | |
B&R | X20BM01 | B&R | 8LVA23.R0030D200-0 | B&R | 5D5500.06 | |
B&R | X20BM05 | B&R | 8V1090.00-1 | B&R | 7CP570.60-1 | |
B&R | X20BM05 | B&R | 8V1090.00-2 | B&R | 2CP200.60-1 | |
B&R | X20BM11 | B&R | 8V1180.00-2 | B&R | 3AM051.6 | |
B&R | X20BM11 | B&R | AM051 3AM051.6 | B&R | 3AT350.6 | |
B&R | X20BM11 | B&R | ECCP80-12-A1 | B&R | 3AT660.6 | |
B&R | X20BM11 | B&R | ECE243-1 | B&R | 3CP153.9 | |
B&R | X20BM11 | B&R | ECNP01-0 | B&R | 3CP260.60-1 | |
B&R | X20BM11 | B&R | ECPE42-11 | B&R | 3CP360.60-1 |
E-mail: alex@fenoux.com
Tel.: +86 13338369201
Skype: +86 13338369201
WhatsApp: +86 13338369201
The winter solstice is Du 1 of the four solar terms of 20 Bai, and ...
Dec. 18 , 2020Let's first take a look at the literal meaning of the DCS system.
Dec. 24 , 2020