INQUIRE NOW
Products Name: X20TB12 B&R Communication Processor
PRODUCT DESCRIPTION
Brand:B&R
Model number:X20TB12
Colour:new
Warranty: 12 months
Lead Time:3-day working day
Country of origin: USA Price: Please contact us
Product weight:0.2kg
Shipping Port: Xiamen, China
Payment: Bank of Chicago, Bank of Singapore
Express cooperation: fedex, DHL, UPS and your express account
Service: Professional Sales provides 24 hours /7 days online service
Description:
Status Description
Off No power supply or mode is NOT_ACTIVE. In this mode, the bus controller waits for about 5 seconds after restarting. No communication with the bus controller is possible. If no POWERLINK communication is detected during these 5 seconds, the bus controller goes into the BASIC_ETHERNET mode. If POWERLINK communication is detected before this time passes, however, the bus controller goes into the PRE_OPERATIONAL_1 mode. Flickering BASIC_ETHERNET mode. The bus controller did not detect any POWERLINK communication. In this mode, direct communication with the bus controller is possible using UDP. If POWERLINK communication is detected while in this mode, the bus controller goes into the PRE_OPERATIONAL_1 mode. Single flash PRE_OPERATIONAL_1 mode. With operation on a POWERLINK V1 master, the bus controller goes directly into PRE_OPERATIONAL_2 mode. With operation on an POWERLINK V2 manager, the CN (Controlled Node) waits for the reception of a SoC frame and then switches over to PRE_OPERATIONAL_2 mode. Double flash PRE_OPERATIONAL_2 mode. In this mode the bus controller is normally configured by the manager. A command (POWERLINK V2) or setting the data valid flag in the output data (POWERLINK V1) then switches the mode to READY_TO_OPERATE. Triple flash READY_TO_OPERATE mode. In a POWERLINK V2 network, the manager then switches via command to OPERATIONAL mode. In a POWERLINK V1 network, the bus controller then switches automatically to OPERATIONAL mode as soon as input data are present. On OPERATIONAL mode Green Blinking STOPPED mode. No output data sent nor input data received. Only the appropriate command from the manager can enter or leave this mode. S/E1)
Red On The bus controller has encountered an error (failed Ethernet frames, increased number of collisions on the network, etc.).
Note: The LED blinks red several times immediately after startup. This is not an error. L/A IFx Green On Link established to the remote station Blinking A link to the remote station has been established and there
Shipping Port: Xiamen, China
Payment: Bank of Chicago, Bank of Singapore
Express cooperation: fedex, DHL, UPS and your express account
Service: Professional Sales provides 24 hours /7 days online service
Relevant details:
X20IF1061-1
X20IF10E1-1
X20IF10E3-1
X20IF2772
X20PD2113
X20PS2100
X20PS9400
X20PS9600
X20SC2212
X20SI9100
X20SL8100
X20SM1426
X20SO4110
X20SO4120
X20SO4120
X20TB12
X20TB1F
X67AI1223
X67BC8321-1
X67BC8321.L12
The winter solstice is Du 1 of the four solar terms of 20 Bai, and ...
Dec. 18 , 2020Let's first take a look at the literal meaning of the DCS system.
Dec. 24 , 2020