Large stock, please search or inquiry

Fenoux Electric Co., Ltd.
Home / Products / GE FANUC / 531X303MCPBBG1 GE Controller module Brand new

531X303MCPBBG1 GE Controller module Brand new

The diagram below compares the space for wiring on a High-Density Terminal Block (left) and an Extended High-Density Terminal Block (right), seen from the bottom of the module.


INQUIRE NOW

Products Name: 531X303MCPBBG1 GE Controller module Brand new

PRODUCT DESCRIPTION

Brand:GE

Model number:531X303MCPBBG1

Colour:new                  

Warranty: 12 months

Lead Time:3-day working day   

Country of origin: USA Price: Please contact us         

Product weight:0.27kg

Shipping Port:  China

Payment: Bank of Chicago, Bank of Singapore

Express cooperation: fedex, DHL, UPS and your express account

Service: Professional Sales provides 24 hours /7 days online service

531X303MCPBBG1  GE  Controller module Brand new     

image.png

 

Battery installation When installing a new battery, when there currently is no battery 

installed, the battery must be installed while the CPU has power. 

Failing to follow this procedure could result in the CPU not powering 

up. 

If a battery is installed while power is off (and there was no battery 

previously installed), and the CPU fails to power up, simply remove the 

battery, power cycle the CPU and then install the battery.

CPU may not detect low-battery condition PACSystems CPUs may not detect a low-battery condition early 

enough to provide a meaningful warning to the user to replace the 

battery. A battery with very low capacity may still have a terminal 

voltage high enough to report that it is a good battery. In this case, 

when the battery starts supplying the memory power (battery backup), 

the battery voltage would quickly drop to unacceptable levels, with little 

warning to the user before failure.

To insure against data loss, users should replace batteries in 

accordance with the guidelines provided in the CPU Reference 

Manual, GFK-2222. Additionally, users could save logic and hardware 

configuration to flash.

Ethernet disconnect during word for word 

change

If the Ethernet connection is broken during a word-for-word change, 

the programmer may not allow a subsequent word-for-word change 

after reconnecting due to the fact that it thinks another programmer is 

currently attached. If this occurs, you should go offline and then back 

online again.

VME modules operating as VME masters

are not supported

The RX7i does not support VME modules operating as bus masters. 

Store of hardware configuration with 

multiple GBCs

Storing a hardware configuration containing two or more Series 90-70 

GBCs twice may cause one GBC to fail configuration. Clearing the 

hardware configuration between stores will prevent this fault from 

being generated. (Note: This issue does not affect Series 

90-30 GBCs.)

Simultaneous Clears, Loads and Stores 

not supported

Currently, the RX7i does not support multiple programmers changing 

CPU contents at the same time. The programming software may 

generate an error during the operation