When installing a new battery, when there currently is no battery installed, the battery must be installed while the CPU has power. Failing to follow this procedure could result in the CPU not powering up. If a battery is installed while power is off (and there was no battery previously installed), and the CPU fails to power up, simply remove the battery, power cycle the CPU and then install the battery.
INQUIRE NOW
Products Name: A04B-0800-C005 GE Controller module Brand new
PRODUCT DESCRIPTION
Brand:GE
Model number:A04B-0800-C005
Colour:new
Warranty: 12 months
Lead Time:3-day working day
Country of origin: USA Price: Please contact us
Product weight:0.27kg
Shipping Port: China
Payment: Bank of Chicago, Bank of Singapore
Express cooperation: fedex, DHL, UPS and your express account
Service: Professional Sales provides 24 hours /7 days online service
A04B-0800-C005 GE Controller module Brand new
• The embedded Ethernet interface is supported by a dedicated microprocessor core. This
dedicated processing capability permits the CPU to support these two LANs with:
o up to 48 simultaneous SRTP Server connections;
o up to 16 simultaneous Modbus/TCP Server connections;
o 32 Clients are permitted; each may be SRTP or Modbus/TCP.
o OPC UA Server with support for up to 5 concurrent sessions with up to 10
concurrent variable subscriptions and up to 12,500 variables;
o up to 255 simultaneous Class 1 Ethernet Global Data (EGD) exchanges;
o two independent Redundant IP addresses, one for each of the embedded
Ethernet LANs.
• Achilles Level 2 Communications Certification1.
• Optional Energy Pack, IC695ACC402, allows CPE330 to instantly save user memory to
non-volatile storage in the event of loss of power.
• Ability to transfer user programs and/or data to and from USB 2.0 A type Removable
Data Storage Devices (RDSDs).
• HART Pass Through allows the CPE330 to communicate HART asset management data
between HART-capable I/O modules and PC-based asset management tools. (Requires
additional HART-compatible products.)
• User may program in Ladder Diagram, Structured Text, Function Block Diagram, or C.
• Contains 64Mbytes of configurable data and program memory.
• Supports auto-located Symbolic Variables that can use any amount of user memory.
• Reference table sizes include 32k bits for discrete %I and %Q and up to 32k words
each for analog %AI and %AQ. Bulk memory (%W) also supported for data
exchanges.
• Supports up to 512 program blocks. Maximum size for a block is 128KB.
• For supported I/O, Communications, Motion, and Intelligent modules, refer to the
PACSystems RX3i System Manual, GFK-2314.
Discrete Input
Modules(1) IC200MDL140 Input 120 VAC (1 Group of 8) 8
Points IC200MDL631 Input 125 VDC Pos/Neg Logic
Isolated 8 Points
IC200MDL141 Input 240 VAC (1 Group of 8) 8
Points IC200MDL632 Input 125 VDC Pos/Neg Logic
Isolated 16 Points
IC200MDL143 Input 120 VAC Isolated 8 Points IC200MDL635 Input 48 VDC Pos/Neg Logic (2
Groups of 8) 16 Points
IC200MDL144 Input 240 VAC Isolated 4 Points IC200MDL636 Input 48 VDC Pos/Neg Logic (4
Groups of 8) 32 Points
IC200MDL240 Input 120 VAC (2 Groups of 8) 16
Points IC200MDL640 Input 24 VDC Pos/Neg Logic (2
Groups of 8) 16 Points
IC200MDL241 Input 240 VAC (2 Groups of 8) 16
Points IC200MDL643 Input 5/12 VDC Pos/Neg Logic (2
Groups of 8) 16 Points
IC200MDL243 Input 120 VAC Isolated 16 Points IC200MDL644 Input 5/12 VDC Pos/Neg Logic (4
Groups of 8) 32 Points
IC200MDL244 Input 240 VAC Isolated 8 Points IC200MDL650 Input 24 VDC Pos/Neg Logic (4
Groups of 8) 32 Points
The winter solstice is Du 1 of the four solar terms of 20 Bai, and ...
Dec. 18 , 2020Let's first take a look at the literal meaning of the DCS system.
Dec. 24 , 2020