When installing a new battery, when there currently is no battery installed, the battery must be installed while the CPU has power. Failing to follow this procedure could result in the CPU not powering up. If a battery is installed while power is off (and there was no battery previously installed), and the CPU fails to power up, simply remove the battery, power cycle the CPU and then install the battery.
INQUIRE NOW
Products Name: A05B-2490-C200 GE Controller module Brand new
PRODUCT DESCRIPTION
Brand:GE
Model number:A05B-2490-C200
Colour:new
Warranty: 12 months
Lead Time:3-day working day
Country of origin: USA Price: Please contact us
Product weight:0.27kg
Shipping Port: China
Payment: Bank of Chicago, Bank of Singapore
Express cooperation: fedex, DHL, UPS and your express account
Service: Professional Sales provides 24 hours /7 days online service
A05B-2490-C200 GE Controller module Brand new
Discrete Input
Modules(1) IC200MDL140 Input 120 VAC (1 Group of 8) 8
Points IC200MDL631 Input 125 VDC Pos/Neg Logic
Isolated 8 Points
IC200MDL141 Input 240 VAC (1 Group of 8) 8
Points IC200MDL632 Input 125 VDC Pos/Neg Logic
Isolated 16 Points
IC200MDL143 Input 120 VAC Isolated 8 Points IC200MDL635 Input 48 VDC Pos/Neg Logic (2
Groups of 8) 16 Points
IC200MDL144 Input 240 VAC Isolated 4 Points IC200MDL636 Input 48 VDC Pos/Neg Logic (4
Groups of 8) 32 Points
IC200MDL240 Input 120 VAC (2 Groups of 8) 16
Points IC200MDL640 Input 24 VDC Pos/Neg Logic (2
Groups of 8) 16 Points
IC200MDL241 Input 240 VAC (2 Groups of 8) 16
Points IC200MDL643 Input 5/12 VDC Pos/Neg Logic (2
Groups of 8) 16 Points
IC200MDL243 Input 120 VAC Isolated 16 Points IC200MDL644 Input 5/12 VDC Pos/Neg Logic (4
Groups of 8) 32 Points
IC200MDL244 Input 240 VAC Isolated 8 Points IC200MDL650 Input 24 VDC Pos/Neg Logic (4
Groups of 8) 32 Points
The winter solstice is Du 1 of the four solar terms of 20 Bai, and ...
Dec. 18 , 2020Let's first take a look at the literal meaning of the DCS system.
Dec. 24 , 2020