Brand: Schneider
Model number:170INT11000
Colour:new
Warranty: 12 months
Lead Time:3-day working day
Country of origin: USA Price: Please contact us
Product weight:0.40kg
Shipping Port: China
Payment: Bank of Chicago, Bank of Singapore
Express cooperation: fedex, DHL, UPS and your express account
Service: Professional Sales provides 24 hours /7 days online service
170INT11000 SCHNEIDER
INQUIRE NOW
Products Name: 170INT11000 SCHNEIDER
PRODUCT DESCRIPTION
Be prepared to make an emergency shutdown when starting the engine, turbine, or other type of prime mover, to protect against runaway or overspeed with possible personal injury, loss of life, or property damage.
Description:
In this case, a correct discrimination is achieved by means of an Iecos characteristic, as the
faulted feeder will have a large active component of residual current, whilst the healthy
feeder will have a small value.
For insulated earth applications, it is common to use the Iesin characteristic that can be
obtained by the setting of the characteristic angle to 90° or 270°.
2.5 Derived earth overcurrent (Ie_d>, P127 only)
The derived earth overcurrent element protection is used to cover applications such as
HTB/HTA transformers. The derived earth current (Ie_d>) is the vectorial summation:
IA + IB + IC:
IA + IB + IC = Ie_d>.
The derived earth overcurrent has two independent thresholds: Ie_d> and Ie_d>>.
The two thresholds can be set as definite delay time or inverse delay time using the IEC,
IEEE/ANSI, CO, RI and RECT curves. Their parameters are shown in the Technical Data
chapter of this Technical Guide.
IA
IB
IC
Ie = Tank Earth
IA+IB+IC = Ie>>>>
IA
IB
IC
Ie = Tank Earth
IA+IB+IC = Ie_d>
P3940ENb
As soon as Ie_d> threshold is running, the instantaneous output associated with this
threshold is activated. This output indicates that the protection element has detected an
earth fault and that the time delay associated with the threshold has started. This time delay
can be blocked via the logic input "Block Logic" associated with this threshold. If this blocking
input is activated by an output contact of a downstream relay, the logic that will lead to the
trip command is then blocked only if the relay that is the closest to the fault can see and
therefore eliminate the fault. This principle is known as «Blocking logic» or «Blocking». It is
described in more detail in this document.
Shipping Port: Xiamen, China
Payment: Bank of Chicago, Bank of Singapore
Express cooperation: fedex, DHL, UPS and your express account
Service: Professional Sales provides 24 hours /7 days online service
Related products:
2704
140CRA93200
170ADM35010
170LNT71000
BMEH584040C
HMIGTO4310
TM221C24T
TSXCUSBMBP
170ENT11002
140CPU67160S
170NEF11021
140cps11420
140aci04000
140aco02000
140NOE77101
DAP212
LMC101CAA10000
The winter solstice is Du 1 of the four solar terms of 20 Bai, and ...
Dec. 18 , 2020Let's first take a look at the literal meaning of the DCS system.
Dec. 24 , 2020