Brand: Schneider
Model number:AS-BDPA-210
Colour:new
Warranty: 12 months
Lead Time:3-day working day
Country of origin: USA Price: Please contact us
Product weight:0.40kg
Shipping Port: China
Payment: Bank of Chicago, Bank of Singapore
Express cooperation: fedex, DHL, UPS and your express account
Service: Professional Sales provides 24 hours /7 days online service
AS-BDPA-210 SCHNEIDER
INQUIRE NOW
Products Name: AS-BDPA-210 SCHNEIDER
PRODUCT DESCRIPTION
Be prepared to make an emergency shutdown when starting the engine, turbine, or other type of prime mover, to protect against runaway or overspeed with possible personal injury, loss of life, or property damage.
Description:
This section describes how negative phase sequence overcurrent protection may be applied
in conjunction with standard overcurrent and earth fault protection in order to alleviate some
less common application difficulties.
− Negative phase sequence overcurrent elements give greater sensitivity to resistive
phase-to-phase faults, where phase overcurrent elements may not operate.
− In certain applications, residual current may not be detected by an earth fault relay
due to the system configuration. For example, an earth fault relay applied on the delta
side of a delta-star transformer is unable to detect earth faults on the star side.
However, negative sequence current will be present on both sides of the transformer
for any fault condition, irrespective of the transformer configuration. Therefore, a
negative phase sequence overcurrent element may be employed to provide timedelayed back-up protection for any un-cleared asymmetrical fault.
− Where fuses protect motors on rotating machines, a blown fuse produces a large
amount of negative sequence current. This is a dangerous condition for the motor due
to the heating effects of negative phase sequence current at double frequency. A
negative phase sequence overcurrent element may be applied to provide efficient
back-up protection for dedicated motor protection relays.
− It may also be required to simply set an alarm at the presence of negative phase
sequence currents on the system. Operators are then prompted to investigate the
cause of the unbalance.
The negative phase sequence overcurrent elements have a current pick up settings I2>,
I2>>, I2>>>, and are time delayed in operation by the adjustable timers tI2>, tI2>>, tI2>>>.
2.9.1 I2 Thresholds Setting Guidelines
This protection element includes three thresholds.
The first threshold can be set as DT or IDMT trip delay time.
The curves are the same as for the [50/51], [50N/51N] protection.
The current pick-up threshold (settable in the menu PROTECTION G1/[46] Neg. Seg. OC)
must be set higher than the normal negative phase sequence current due to the normal load
unbalance that is always present on the system. This can be set at the commissioning stage,
making use of the relay measurement function to display the standing negative phase
sequence current, and apply a setting at least 20% above.
Where the negative phase sequence element is required to operate for specific un-cleared
asymmetric faults, a precise threshold setting has to be based on an individual fault analysis
for that particular system due to the complexities involved. However, to ensure operation of
the protection element, the current pick-up setting must be set approximately 20% below the
lowest calculated negative phase sequence fault current for a specific remote fault condition.
The correct setting of the time delay is vital for this protection element. It should be also seen
that this element is applied primarily to provide back-up protection to other protective devices
or to provide an alarm. Therefore, it would be associated with a long delay time.
It must be ensured that the time delay is set longer than the operating time of any other
protective device (at minimum fault level) on the system, which may respond to unbalanced
faults, such as:
− Phase overcurrent protection elements
− Earth fault protection elements
− Broken conductor protection elements
− Negative phase sequence influenced thermal protection elements
Shipping Port: Xiamen, China
Payment: Bank of Chicago, Bank of Singapore
Express cooperation: fedex, DHL, UPS and your express account
Service: Professional Sales provides 24 hours /7 days online service
Related products:
2704
140CRA93200
170ADM35010
170LNT71000
BMEH584040C
HMIGTO4310
TM221C24T
TSXCUSBMBP
170ENT11002
140CPU67160S
170NEF11021
140cps11420
140aci04000
140aco02000
140NOE77101
DAP212
LMC101CAA10000
The winter solstice is Du 1 of the four solar terms of 20 Bai, and ...
Dec. 18 , 2020Let's first take a look at the literal meaning of the DCS system.
Dec. 24 , 2020