Large stock, please search or inquiry

Fenoux Electric Co., Ltd.
Home / Products / Schneider / AS-MBPL-001 SCHNEIDER

AS-MBPL-001 SCHNEIDER

Brand: Schneider

Model number: AS-MBPL-001

Colour:new                  

Warranty: 12 months

Lead Time:3-day working day   

Country of origin: USA Price: Please contact us         

Product weight:0.40kg

Shipping Port:  China

Payment: Bank of Chicago, Bank of Singapore

Express cooperation: fedex, DHL, UPS and your express account

Service: Professional Sales provides 24 hours /7 days online service

AS-MBPL-001   SCHNEIDER

INQUIRE NOW

Products Name: AS-MBPL-001 SCHNEIDER

PRODUCT DESCRIPTION

Most of circuit breakers provide one trip-close-trip cycle. A delay time is necessary to return to the nominal state of the CB (for example, the spring that allows the circuit breaker to close should be fully charged). The state of the CB can be checked using an input assigned to the 

“CB FLT” function. If on completion of the “Ext CB Fail time” (tCFE), the “CB FLT” indicates a failed state of the CB, a lockout occur and the CB remains open.

Description:

Clear Memory Button

The CLEAR MEMORY push-button erases all the memory in the ACX 

series controller, including configuration details, point information, 

and Plain English programming — the ACX controller recovers with a 

Cool Start. For more information about Cool Start mode, see “Available 

Restart Modes for the ACX 57xx Series Controller” on page 121.

Note: Clearly, this is not a button you want to press unless you really

mean it. Be careful!

Pre-Operation Checks and Power Up

This section discusses pre-operation checks, initial power-up, and the 

power-up sequence.

Pre-Operation Checks

Please perform the following steps before powering up an ACX 57xx 

series controller.

1. Make sure the internal battery is connected.

2. Make sure the input power is wired properly.

3. Make sure that the ACX controller has a true earth ground.

4. Make sure you have used the proper cables and wires at correct 

lengths.

5. Make sure that the Infinet cables and shields have been properly 

wired.

For more information on pre-operation checks, please see the ACX 57xx 

Series Controller Installation Instructions, 30-3001-998.

ACX 57xx Series Controller Operation and Technical Reference Guide 129

Chapter 7: Operation and Programming

Initial Power-Up

The ACX 57xx series controller has no power switch. Power is applied 

through a three-pin power supply input. To apply power to the 

controller, connect the power supply input to a power source.

When power is applied, the CPU LED and the EXP PORT PWR LED 

should illuminate. Once power is applied, the power-on system tests 

run and the ACX controller awaits instructions.

If the ACX series controller is connected to the Ethernet, the LINK and 

10/100 LEDs should illuminate as described in “Ethernet Activity 

Indicators” on page 128.


AS-MEEP-001   SCHNEIDER

Shipping Port: Xiamen, China

Payment: Bank of Chicago, Bank of Singapore

Express cooperation: fedex, DHL, UPS and your express account

Service: Professional Sales provides 24 hours /7 days online service

image.png

Related products:

2704

140CRA93200

170ADM35010

170LNT71000

BMEH584040C

HMIGTO4310 

TM221C24T

TSXCUSBMBP

170ENT11002

140CPU67160S

170NEF11021

140cps11420

140aci04000

140aco02000

140NOE77101

DAP212

LMC101CAA10000