Brand: Schneider
Model number: AS-MEEP-000
Colour:new
Warranty: 12 months
Lead Time:3-day working day
Country of origin: USA Price: Please contact us
Product weight:0.40kg
Shipping Port: China
Payment: Bank of Chicago, Bank of Singapore
Express cooperation: fedex, DHL, UPS and your express account
Service: Professional Sales provides 24 hours /7 days online service
AS-MEEP-000 SCHNEIDER
INQUIRE NOW
Products Name: AS-MEEP-000 SCHNEIDER
PRODUCT DESCRIPTION
When setting the relay characteristic/torque angle for the three phase directional overcurrent element, a positive angle setting was specified. This was due to the fact that we consider as polarising voltage, the phase voltage value in quadrature of the current under fault conditions. With directional earth fault protection, the residual current under fault conditions lies at an angle lagging the polarising residual earth fault voltage.
Description:
Clear Memory Button
The CLEAR MEMORY push-button erases all the memory in the ACX
series controller, including configuration details, point information,
and Plain English programming — the ACX controller recovers with a
Cool Start. For more information about Cool Start mode, see “Available
Restart Modes for the ACX 57xx Series Controller” on page 121.
Note: Clearly, this is not a button you want to press unless you really
mean it. Be careful!
Pre-Operation Checks and Power Up
This section discusses pre-operation checks, initial power-up, and the
power-up sequence.
Pre-Operation Checks
Please perform the following steps before powering up an ACX 57xx
series controller.
1. Make sure the internal battery is connected.
2. Make sure the input power is wired properly.
3. Make sure that the ACX controller has a true earth ground.
4. Make sure you have used the proper cables and wires at correct
lengths.
5. Make sure that the Infinet cables and shields have been properly
wired.
For more information on pre-operation checks, please see the ACX 57xx
Series Controller Installation Instructions, 30-3001-998.
ACX 57xx Series Controller Operation and Technical Reference Guide 129
Chapter 7: Operation and Programming
Initial Power-Up
The ACX 57xx series controller has no power switch. Power is applied
through a three-pin power supply input. To apply power to the
controller, connect the power supply input to a power source.
When power is applied, the CPU LED and the EXP PORT PWR LED
should illuminate. Once power is applied, the power-on system tests
run and the ACX controller awaits instructions.
If the ACX series controller is connected to the Ethernet, the LINK and
10/100 LEDs should illuminate as described in “Ethernet Activity
Indicators” on page 128.
Shipping Port: Xiamen, China
Payment: Bank of Chicago, Bank of Singapore
Express cooperation: fedex, DHL, UPS and your express account
Service: Professional Sales provides 24 hours /7 days online service
Related products:
2704
140CRA93200
170ADM35010
170LNT71000
BMEH584040C
HMIGTO4310
TM221C24T
TSXCUSBMBP
170ENT11002
140CPU67160S
170NEF11021
140cps11420
140aci04000
140aco02000
140NOE77101
DAP212
LMC101CAA10000
The winter solstice is Du 1 of the four solar terms of 20 Bai, and ...
Dec. 18 , 2020Let's first take a look at the literal meaning of the DCS system.
Dec. 24 , 2020