Large stock, please search or inquiry

Fenoux Electric Co., Ltd.
Home / Products / WoodWard / 5462-085 WOODWARD

5462-085 WOODWARD

Brand:  WoodWard

Model number:5462-085

Colour:new                  

Warranty: 12 months

Lead Time:3-day working day   

Country of origin: USA Price: Please contact us         

Product weight:0.85kg

Shipping Port:  China

Payment: Bank of Chicago, Bank of Singapore

Express cooperation: fedex, DHL, UPS and your express account

Service: Professional Sales provides 24 hours /7 days online service

5462-085   WOODWARD

INQUIRE NOW

Products Name: 5462-085 WOODWARD

PRODUCT DESCRIPTION

Prior to commissioning ensure that all measuring devices are connected in correct phase sequence. The connect command for the unit circuit breaker must bedisconnected at the unit circuit breaker. The field rotation must be monitored for proper rotation. Any absence of or incorrect connection of voltage measuring devices or other signals may lead to malfunctions and damage the unit, the engine, and/or components connected to the unit

Benefits:

 

This chapter covers the checkout and calibration of the SPM-A Synchronizer. 

These procedures must be followed in sequence for proper calibration of the 

synchronizer. Notes in the text indicate when procedures are different for each 

SPM-A model. 

Before attempting to calibrate the synchronizer, read Woodward 

Manual 82715, Guide for Handling and Protection of Electronic 

Controls, Printed Circuit Boards, and Modules. 

General Information 

Read and follow these instructions carefully when checking or calibrating the 

synchronizer: 

· Observe precautions for handling static-sensitive devices (see page iii). 

· Use battery-operated test equipment whenever possible. 

· Isolate the test equipment from all grounds, including the chassis. 

· Use a digital multimeter (DMM) for all measurements and a volt-ohmmeter 

(VOM) when checking indicators and relay contacts. 

· Apply power to the synchronizer before applying power to any test 

equipment connected to it. 

· Make sure that the wiring connections have been made in accordance with 

the plant wiring diagram (Figure 1-4) and that the connections are tight. 

· The values given in this procedure are the values used by the factory for 

calibration of the new synchronizer. Be sure that no specification changes or 

modifications have been made that will change these values. 

Pre-Checkout 

All other units in the engine control system must be adjusted and working 

correctly before operating the synchronizer. While operating the engine to make 

adjustments on the other units, the synchronizer mode switch (user supplied) 

must be in the OFF position. 

Dwell Time Adjustment 

The dwell time is factory set at 1/2 second. To set the dwell time for one of the 

other settings (1/8, 1/4, or 1 second) do the following: 

1. Turn off the power to all voltage inputs to the synchronizer. 

2. Remove the four elastic nuts securing the synchronizer cover. Remove the 

cover. 

To prevent damage to the components of the synchronizer, read and 

follow the Electrostatic Discharge Awareness precautions on page iii.


5462-085   WOODWARD

Shipping Port:  China

Payment: Bank of Chicago, Bank of Singapore

Express cooperation: fedex, DHL, UPS and your express account

Service: Professional Sales provides 24 hours /7 days online service

image.png

Related products:

9907-018

DSS-2

5464-643

5466-031

5466-253

5466-258

5466-348

5466-353

5501-367

5501-376

5464-658

5466-409

9907-838

9907-014

9905-131

9907-186

9907-414

9907-838

9970-164

5441-413

9905-003

505-4532

8200-224

1247-007

1326-183

1355-169

5210-543

5464-551

8250-565

8290-195

8405-307

8406-113