Brand: WoodWard
Model number:5462-758
Colour:new
Warranty: 12 months
Lead Time:3-day working day
Country of origin: USA Price: Please contact us
Product weight:0.85kg
Shipping Port: China
Payment: Bank of Chicago, Bank of Singapore
Express cooperation: fedex, DHL, UPS and your express account
Service: Professional Sales provides 24 hours /7 days online service
5462-758 WOODWARD
INQUIRE NOW
Products Name: 5462-758 WOODWARD
PRODUCT DESCRIPTION
Woodward has launched hardware and software updates to address many CIP requirements; however, complete NERC/CIP compliance involves more than the controls and is dependent on plant infrastructure and procedures. The physical security remains the user’s responsibility.
Benefits:
For installation into a panel door with the fastening clamps, please proceed as follows:
1. Panel cutout
Cut out the panel according to the dimensions in Figure 3-3.
Note: It is not necessary to drill the holes if the fastening clamps are used.
b
h H
B
2. Remove terminals
Loosen the wire connection terminal screws on the back of the unit and
remove the wire connection terminal strip if required.
3. Insert screws in clamps
Insert the four clamping screws into the clamp inserts from the shown
side (opposite of the nut insert) until they are almost flush. Do not completely insert the screws into the clamp inserts.
4. Insert unit into cutout
Insert the unit into the panel cutout. Verify that the unit fits correctly in
the cutout. If the panel cutout is not big enough, enlarge it accordingly.
5. Attach clamp inserts
Re-install the clamp inserts by tilting the insert to a 45° angle. (1) Insert
the nose of the insert into the slot on the side of the housing. (2) Raise the
clamp insert so that it is parallel to the control panel.
1
2
6. Tighten clamping screws
Tighten the clamping screws (1) until the control unit is secured to the
control panel (2). Over tightening of these screws may result in the clamp
inserts or the housing breaking. Do not exceed the recommended tightening torque of 0.1 Nm (0.9 pound-force inches).
1
2
7. Reattach terminals
Reattach the wire connection terminal strip (1) and secure them with the
side screws.
Shipping Port: China
Payment: Bank of Chicago, Bank of Singapore
Express cooperation: fedex, DHL, UPS and your express account
Service: Professional Sales provides 24 hours /7 days online service
Related products:
9907-018
DSS-2
5464-643
5466-031
5466-253
5466-258
5466-348
5466-353
5501-367
5501-376
5464-658
5466-409
9907-838
9907-014
9905-131
9907-186
9907-414
9907-838
9970-164
5441-413
9905-003
505-4532
8200-224
1247-007
1326-183
1355-169
5210-543
5464-551
8250-565
8290-195
8405-307
8406-113
The winter solstice is Du 1 of the four solar terms of 20 Bai, and ...
Dec. 18 , 2020Let's first take a look at the literal meaning of the DCS system.
Dec. 24 , 2020