Large stock, please search or inquiry

Fenoux Electric Co., Ltd.
Home / Products / WoodWard / 5501-470 WOODWARD

5501-470 WOODWARD

Brand:  WoodWard

Model number:5501-470 

Colour:new                  

Warranty: 12 months

Lead Time:3-day working day   

Country of origin: USA Price: Please contact us         

Product weight:0.85kg

Shipping Port:  China

Payment: Bank of Chicago, Bank of Singapore

Express cooperation: fedex, DHL, UPS and your express account

Service: Professional Sales provides 24 hours /7 days online service

5501-470   WOODWARD


INQUIRE NOW

Products Name: 5501-470 WOODWARD

PRODUCT DESCRIPTION

Woodward has launched hardware and software updates to address many CIP requirements; however, complete NERC/CIP compliance involves more than the controls and is dependent on plant infrastructure and procedures. The physical security remains the user’s responsibility.

Benefits:

The following instructions and wiring diagrams illustrate typical wiring 

connections. For applications not shown in Figures 2-1 and 2-2, refer to the plant 

wiring diagram (Figure 1-4) or contact Woodward for assistance. 

Connect the synchronizer terminals as shown in Figure 1-4. When making the 

connections, observe the following: 

· Make all connections using insulated terminals. 

· Use 0.5 mm² (20 AWG) or larger stranded, twisted shielded wire. 

· Make sure that all wires shown as shielded on the plant wiring diagram, are 

shielded. 

· Do not place shielded wires in the same cable conduits with high-voltage or 

high-current carrying cables. 

· Do not connect the cable shields to any external grounds. The shields are 

grounded at the control end only. 

· Make sure that cable shields are carried through all intermediate terminal 

blocks from signal source to signal termination. 

· Do not subject any wiring to temperatures above 100 °C (212 °F). 

· Avoid kinks or sharp bends in the wiring. 

· Make sure that all connections are tight. 

For additional wiring information, see Woodward Manual 25070, Electric 

Governor Installation Guide. 

Install and wire the other units and actuators in your system using instructions in 

applicable manuals. 

Connections to the Generator 

The synchronizer is powered by voltage supply connections to the generator 

potential transformers (PTs). It uses a standard 120 Vac or 208/230 Vac, 50/60 

Hz input. The synchronizer can use the same voltage connections to the 

generator PTs as the electronic governor's load sensor. Power consumption of 

the synchronizer is 5 W maximum. 

1. Connect the generator PT neutral to synchronizer terminal 5 (Figure 2-1). 

2. Connect one phase of the generator PT (usually phase A) to synchronizer 

terminal 2. 

3. Connect the same phase from the bus PT to synchronizer terminal 6. 

4. Connect bus neutral to terminal 9.

5453-276   WOODWARD

Shipping Port:  China

Payment: Bank of Chicago, Bank of Singapore

Express cooperation: fedex, DHL, UPS and your express account

Service: Professional Sales provides 24 hours /7 days online service

image.png

Related products:

9907-018

DSS-2

5464-643

5466-031

5466-253

5466-258

5466-348

5466-353

5501-367

5501-376

5464-658

5466-409

9907-838

9907-014

9905-131

9907-186

9907-414

9907-838

9970-164

5441-413

9905-003

505-4532

8200-224

1247-007

1326-183

1355-169

5210-543

5464-551

8250-565

8290-195

8405-307

8406-113